Concord Hospital MSB

In Mid 2013 Southern Cross Switchboards were involved in manufacturing and supplying a new MSB for the Concord Hospital. The switchboard brief involved manufacturing a weatherproof MSB with a 400A SPD suppling a 200A circuit to the DEW building and 100A circuit separately metered for the Outbuildings. The board was delivered to site in mid September 2013.