Berkeley Community Centre

Berkeley Community Centre is located on Winnima way, the Berkeley Neighbourhood Centre holds lot of activities and events fora  diverse range of people. Lots of events are free and affordable to help people be socially active and be connected. The events in the community hall vary from weekly fitness exercises to weddings.

During 2015 the Berkeley Community Centre required a much needed upgrade. The upgrade included replacing the existing MSB and installation of 5 new Distribution Boards. Southern Cross Switchboards had won the job during August 2015.

The MSB’s (30kA, IP56, Form 2b, 400A) exterior finishing was 316 Grade Stainless Steel N4 finish. Escutcheon on the other hand was Gloss White. The stainless steel was folded and welded with weatherproof profile and a sloping roof.

The unique factor about the project was the distribution board’s IP rating. It is quite rare for distribution boards to be rated IP56. The gland plates for the distribution board were fixed via metal thread screws. All distribution boards were different in sizes and pole. The exterior finishing was X15 orange.

At the end of project all the Switchboards were successfully delivered on time and as feedback from our client we were motivated to “continue the great work”.